How it works

How assurance runs across your engineering workflow

standrdX validates engineering handoffs against the standards and requirements that govern them, and records every engineering decision with its evidence. The same five-step sequence runs on a single vendor submission or on every deliverable in a project.

How does standrdX work?

standrdX works in five steps. It establishes which requirement governs each document, using the project's precedence order. It checks every document in scope against that requirement and raises findings with a verdict, severity, clause and source quote. It compares drawing revisions side by side. Finally, an engineer accepts or rejects each finding, and the decision is recorded in a findings register that exports to PDF and Excel.

Before the first run

Three things you load. Nothing is configured from scratch.

A workspace holds the standards your organisation reuses across projects. A project holds the documents under review and the addenda that apply only to it. The result is a digital engineering process that does not change depending on who is reviewing.

01 · WORKSPACE

Your standards library

Owner, industry and internally authored standards, uploaded once and reused across every project in the workspace.

02 · PROJECT

Project addenda

Project-specific controls and deviations layered on top of the workspace library, scoped to the project they belong to.

03 · DOCUMENTS

The deliverables under review

Specifications, datasheets, drawings, BOMs and vendor submissions, uploaded directly or pulled from connected cloud storage.

The sequence

Five steps from document to decision

This is engineering workflow management at the level a review actually happens: document review automation across every deliverable in scope, with an engineer ruling on every finding it raises.

FIGURES SHOWN IN THE PANELS BELOW ARE ILLUSTRATIVE

01

Establish what governs

standrdX reads the loaded standards, specifications, owner requirements and project addenda, and builds the requirement baseline for the project. Where requirements overlap or conflict, precedence determines which one applies, and that decision is carried into every check that follows. Precedence order is set per project, so every document is reviewed against the requirement that actually governs it.

Workspace standardsBASELINE
Project specificationAPPLIES
Project addendumOVERRIDES
Governing requirement setRESOLVED
02

Run assurance across the document set

A run checks every document in scope against the requirement that governs it. Run the full set when a project opens, then run incrementally as new revisions arrive, so review effort goes to what changed instead of content that has already been checked.

Documents in scope142
Run typeINCREMENTAL
New since last run18
Findings raised27
03

Review findings, with confidence separated from verdict

Each finding carries a verdict, a severity, the clause it was checked against and the source quote it came from. Confidence is reported separately, so a reviewer can see how certain the system is without that shaping the verdict.

VerdictNON-CONFORMANT
SeverityHIGH
Source quoteATTACHED
ConfidenceREPORTED SEPARATELY
04

Compare revisions instead of re-reading them

When a drawing is reissued, two revisions are placed side by side with the differences overlaid and a discrepancy list describing what changed, each entry ranked by severity. Unchanged content is skipped, so reviewers do not re-read a whole drawing to find one change.

Rev 02 → Rev 03COMPARED
Structural differences9
Ranked by severityYES
Unchanged contentSKIPPED
05

Close the finding and export the record

An engineer accepts or rejects each finding. The disposition, the reviewer and the reasoning are recorded, and the findings register exports to PDF and Excel for sign-off, audit and handover.

Accepted19
Rejected with reason6
Open for decision2
ExportPDF · EXCEL

The decision, on record

The review record is a by-product of the review

standrdX writes every action to the record as it happens: findings raised, severity changes, acceptances, rejections and closures, each with the reviewer and the reasoning behind it.

Nothing needs to be reconstructed later. The trail from document to decision already exists when an audit, customer review or project handover calls for it.

PROJECT ACTIVITY · FINDING F-0412
09:14Finding raisedIncremental run · 18 documentsSYSTEM
11:02Opened for reviewAssigned to piping disciplineWORKSPACE ADMIN
14:38Severity overriddenReduced to Medium, justification recordedREVIEWER
15:20Accepted and closedCarried to the findings registerREVIEWER
Illustrative activity record

FAQ

Questions about running it

How long does it take to set up a first run?

Setup time depends mainly on how many standards you load and how many documents are in scope. Nothing is configured from scratch: you load your standards, any project addenda and the documents under review. Once the workspace library exists, it is reused on every later project, so each new project starts with most of the setup already done.

Do we have to move our documents into standrdX?

No. Documents are uploaded directly or pulled from connected cloud storage. standrdX does not replace the system where your documents live.

What happens when a revision arrives?

Run incrementally. standrdX checks what changed rather than re-reading the whole document set, and drawing revisions can be compared side by side with the differences listed and ranked by severity.

Can we tell standrdX which standard should win?

Yes. Precedence is set per project, for example whether a project addendum overrides an owner standard. The order that applies on your project is the order standrdX applies.

Who can accept or reject a finding?

An engineer with the right role on the project. standrdX proposes findings, but it never accepts or closes one on its own. Roles and permissions are set out on the Security & Governance page.

What do we get at the end of a run?

A findings register with the governing clause, the evidence and the reviewer's disposition on each entry, plus discrepancy lists for any compared drawings. Both export to PDF and Excel for sign-off, audit and handover.

Next step

See the workflow on your own documents.

Load one of your standards and a sample document set, and watch the sequence run against material your engineers already know, from governing requirement to recorded decision.